×

underground concrete meaning in English

地下混凝土

Examples

  1. Constructing underground concrete impervious wall for facing dam of lianghuei reservoir
    梁辉水库面板坝水下混凝土防渗墙施工
  2. How to choose the suitable method to resolve the leakage of water in underground concrete structure is a very difficult problem to every civil engineer , for the cracks and leakage of water in underground concrete structure is hard to be avoided
    摘要地下工程混凝土结构裂缝及渗漏水是难以避免的质量通病,如何选择合适的处理渗漏水方法是每个土木工程师都需面临的难题。
  3. The works included 24 bored piles of 2 . 5 meters in diameter and 55 meters in depth , 500 meters long underground concrete diaphragm wall of 0 . 8 meters thick and 25 meters deep , 450 pre - cast concrete pile of 0 . 5 meters in diameter , 12 meters deep soil excavation with multi - layer post - tensioning shoring system , reinforced concrete pile caps and basement slabs
    其工程内容包括了24支直径2 . 5米,深达55米直入岩层的钻孔桩,周长500米,深度25米,厚度0 . 8米的地下连续混凝土墙, 450支直径0 . 5米预制混凝土桩, 12米深开挖,多层水平钢支撑系统,混凝土桩承台及地库底板结构。
  4. Researching on the technology if reverse order is to study strains if pits , structural systems if basement , environmental surwey and underpinnings . on account of emphasizing developing methods if checking strength if pick - ets , modemizing machenes of excavation and studying methods of underpinning is put forward and is a way if controlling the quality of pickets in sites , which leads an active effect ; synthetic application if rankintheory , spatial and time effect theory to excavation tl aanalyze the state of soil force and strain is brought forward and the time effect should be considered in the zone of clay , the formation and development of soil plasticity are analyzed and the most dangerous zone to decide how to excavate and where to begin is found ; analyzing the cause of picket settlement during reverse order and the differential settlement and discussing hlw to solute it . duringh the temporary survey and the environmental warship , bringing rorward the theory of environmental vibration and analyzing the state of soil force and probability of losing stabilization of soil under the effect of environmental vibration ; analyzing the state offeree in underground concrete wall by the method of mathematics and pointing out the place of the maximum force and deformation . based on systematic illustrating the reverse order , problems about application and development of reverse order and suggestions also are expressed
    鉴于国内外的研究把重点放在大力发展工程桩的实验室承载力监测方法与设备、如何使土方开挖机械现代化及对周围建筑的临测方法上,本文提出了现场利用声波层析成像技术监测钢砼桩内部质量的方法与程序,并得出了声波层析成像技术是砼桩的动态质量检测的有效手段,这对指导施有积极、现实意义;提出了综合运用朗肯土压力理论、基坑空间和时间效应影响理论来分析逆作法施工过程中基坑边坡土体应力及应变的变化情况,指出粘土地区也应考虑时间效应,并且进一步分析了基坑边坡土体的塑性区形成和发展,找出边坡最不利的区域,以确定地下室土体的挖掘的方式和顺序,指出凭主观臆断与经验来施工是不可取的;在分析、经较逆作法与大开挖顺作法的地下室结构体系受力情况及施工顺序的不同,提出了节点处理技术;分析了逆作法施工期间桩的沉降变化原因及由此而产生的差异,并探讨了解决的方法;本文还提出了环境振动对土体边坡稳定产生影响的观点,并分析了在环境振动影响下,土体的应力状态及土休失稳破坏概率,并且还运用弹性力学知识和数学分析的方法定量地分析了地下混凝土墙受力状态,指出了被监测墙体的最大应力、应变位置。

Related Words

  1. underground fire
  2. underground parking
  3. underground palace
  4. underground burying
  5. underground propagation
  6. underground opening
  7. underground substation
  8. underground street
  9. underground music
  10. underground system
  11. underground command post
  12. underground communication
  13. underground condition
  14. underground conditions
PC Version

Copyright © 2018 WordTech Co.